Projects
We develop, own, and operate hydro, wind and solar power plants in the Nordic region.
Below you will find an overview of Cloudberry's operational power plants as well as plants under construction and development. Estimated production volumes are based on long historical measurements (typically 20 years for hydro) and indicate annual estimated production.
Odin Wind Farm
- Location
- Danmark (93% in DK1, 2% in DK2) (6% in SE-3)
- Asset type
- Wind
- In operation
- Avg 2016.
- Gross installed capacity
- 133 MW (106 MW)
- Gross annual production
- 389 GWh (311 GWh)
- Ownership
- 80%
- Land lease remaining years
- > 100 (Owns the land)
- Status
- Producing
Hån Wind Farm
- Location
- Sweden (Selling power in NO-1)
- Asset type
- Wind
- In operation
- 2022
- Gross installed capacity
- 21 MW
- Gross annual production
- 74 GWh
- Ownership
- 100%
- Land lease remaining years
- 30
- Status
- Producing
Read more
Hån Vindpark wind farm is located in Årjäng municipality, Sweden, near the Norwegian border. Marker wind farm is built on the Norwegian side of the border. Hån has 5 wind turbines with an installed capacity of 21 MW and an estimated annual production of 74 GWh. Construction of the wind farm began in August 2021, and the power plant is operational.
Sundby Wind Farm (Kafjärden)
- Location
- Sverige (SE-3)
- Asset type
- Wind
- In operation
- 2023
- Gross installed capacity
- 32.4 MW
- Gross annual production
- 89 GWh
- Ownership
- 100%
- Land lease remaining years
- 37
- Status
- In test production
Read more
Sundby Wind farm (Kafjärden) is located in Eskilstuna municipality, Sweden. All 9 Vestas turbines are installed and operational. Expecting 80-90% of normal production in 2024 due to ongoing grid reinforcements. Expecting 100% from H2 2025.
Usma Kraft Hydropower
- Location
- Norway (NO-3)
- Asset type
- Hydro
- In operation
- 2013
- Gross installed capacity
- 9 MW
- Gross annual production
- 26 GWh
- Ownership
- 100%
- Land lease remaining years
- >100
- Status
- Producing
Read more
Usma Kraft hydropower plant is located in Selbu municipality in Trøndelag county and produces from the water in lake Usme and Gardåa river. The expected annual production is 26 GWh (9 MW).
Bøen I & II
- Location
- Norway (NO-2)
- Asset type
- Hydro
- In operation
- 2016
- Gross installed capacity
- 6 MW
- Gross annual production
- 18 GWh
- Ownership
- 100 %
- Land lease remaining years
- 40
- Status
- Producing
Read more
Bøen I & II hydropower plants are located in Hjelmeland municipality in Rogaland, Norway and expected annual production is 18 GWh.
Steinbergdalen Hydropower (Skåråna Kraft)
- Location
- Norway (NO-2)
- Asset type
- Hydro
- In operation
- 2022
- Gross installed capacity
- 2.4 MW
- Gross annual production
- 8 GWh
- Ownership
- 100%
- Land lease remaining years
- 38
- Status
- Producing
Read more
The hydropower plants, Steinbergdalen and Flatestøl (Skåråna Kraft), caame into production in 2022.
Flatestøl Hydropower (Skåråna Kraft)
- Location
- Norway (NO-2)
- Asset type
- Hydro
- In operation
- 2022
- Gross installed capacity
- 2 MW
- Gross annual production
- 7 GWh
- Ownership
- 100%
- Land lease remaining years
- 38
- Status
- Producing
Read more
The hydropower plants, Steinbergdalen and Flatestøl (Skåråna Kraft) are in production from 2022.
Røyrmyra Wind Farm
- Location
- Norway (NO-2)
- Asset type
- Wind
- In operation
- 2015
- Gross installed capacity
- 2.4 MW
- Gross annual production
- 8 GWh
- Ownership
- 100%
- Land lease remaining years
- 43
- Status
- Producing
Read more
Røyrmyra Vindpark is a Norwegian wind farm acquired in 2019. The three Enercon turbines have a combined capacity of 2.4 MW and has approx. 3.500 full load hours a year, and an annual production of 8 GWh.
Bjørgelva Kraft Hydropower
- Location
- Norway (NO-4)
- Asset type
- Hydro
- In operation
- Q4 2020
- Gross installed capacity
- 2.5 MW
- Gross annual production
- 7 GWh
- Ownership
- 100%
- Land lease remaining years
- 57
- Status
- Producing
Read more
Bjørgelva Kraft is situated in Sørreisa municipality. The hydropower plant will have an expected annual production of 7 GWh. Bjørgelva Kraft became a part of our portfolio after completion of the commissioning period on 30 June 2021.
Tinnkraft
- Location
- Norway (NO-2)
- Asset type
- Hydro
- In operation
- 2008
- Gross installed capacity
- 2,4 MW
- Gross annual production
- 6 GWh
- Ownership
- 100 %
- Land lease remaining years
- 58
- Status
- Producing
Read more
Tinnkraft is situated in Tinn municipality. The hydropower plant has expected annual production of 6 GWh.
Finnesetbekken Kraftverk Hydropower
- Location
- Norway (NO-5)
- Asset type
- Hydro
- In operation
- 2011
- Gross installed capacity
- 1.4 MW
- Gross annual production
- 3 GWh
- Ownership
- 100%
- Land lease remaining years
- 38
- Status
- Producing
Read more
Finnesetbekken Kraftverk is located in Nes municipality. The power plant is a small hydroelectric power plant with an annual production of approx. 3 GWh.
Odal Wind Farm
- Location
- Norway (NO-1)
- Asset type
- Wind
- In operation
- 2022
- Gross installed capacity
- 163 MW (54 MW)
- Gross annual production
- 528 GWh (176 GWh)
- Ownership
- 33.4%
- Land lease remaining years
- 28
- Status
- Producing
Read more
Odal wind farm and Siemens Gamesa have an ongoing program through 2024 to replace blades on the wind turbines.
For more information about the Odal windfarm: https://odalvind.no/
Kvitno Hydropower (Part of Forte portfolio)
- Location
- Norway (NO-2)
- Asset type
- Hydro
- In operation
- 2015
- Gross installed capacity
- 9 MW (3.1 MW)
- Gross annual production
- 33 GWh (11 GWh)
- Ownership
- 34%
- Land lease remaining years
- Avg. 36
- Status
- Producing
Read more
Kvitno hydropower is located in Odda, Vestland.
Svardøla Hydropower (Part of Forte portfolio)
- Location
- Norway (NO-5)
- Asset type
- Hydro
- In operation
- 2018
- Gross installed capacity
- 9.8 MW (3.3 MW)
- Gross annual production
- 29 GWh (10 GWh)
- Ownership
- 34%
- Land lease remaining years
- Avg. 51
- Status
- Producing
Read more
Svardøla hydropower is located in Luster, Vestland.
Setredalen Hydropower (Part of Forte portfolio)
- Location
- Norway (NO-3)
- Asset type
- Hydro
- In operation
- 2019
- Gross installed capacity
- 4.8 MW (1.4 MW)
- Gross annual production
- 20 GWh (7 GWh)
- Ownership
- 34%
- Land lease remaining years
- Avg. 47
- Status
- Producing
Read more
Setredalen hydropower is located in Bremanger, Vestland.
Eldao Hydropower (Part of Forte portfolio)
- Location
- Norway (NO-5)
- Asset type
- Hydro
- In operation
- 2018
- Gross installed capacity
- 9.7 MW (3.3 MW)
- Gross annual production
- 29 GWh (10 GWh)
- Ownership
- 34%
- Land lease remaining years
- Avg. 51
- Status
- Producing
Read more
Eldao hydropower is located in Luster, Vestland.
Anga Hydropower (Part of Forte portfolio)
- Location
- Norway (NO-3)
- Asset type
- Hydro
- In operation
- 2019
- Gross installed capacity
- 7.8 MW (2.7 MW)
- Gross annual production
- 22 GWh (7 GWh)
- Ownership
- 34%
- Land lease remaining years
- avg. 47
- Status
- Producing
Read more
Anga hydropower is located in Førde, Vestland.
Tverrdalselvi Hydropower (Part of Forte portfolio)
- Location
- Norway (NO-5)
- Asset type
- Hydro
- In operation
- 2020
- Gross installed capacity
- 6 MW (2 MW)
- Gross annual production
- 17 GWh (6 GWh)
- Ownership
- 34%
- Land lease remaining years
- Avg. 51
- Status
- Producing
Read more
Tverrdalselvi hydropower is located in Fjærland, on the west coast of Norway.
Skeidsflåten Hydropower (Part of Forte portfolio)
- Location
- Norway (NO-5)
- Asset type
- Hydro
- In operation
- 2020
- Gross installed capacity
- 4.8 MW (1.6 MW)
- Gross annual production
- 18 GWh (6 GWh)
- Ownership
- 34%
- Land lease remaining years
- Avg. 51
- Status
- Producing
Read more
Skeidsflåten hydropower is located in Fjærland, Vestland.
Rusdalsåni Hydropower (Part of Forte portfolio)
- Location
- Norway (NO-2)
- Asset type
- Hydro
- In operation
- 2019
- Gross installed capacity
- 5.2 MW (1.8 MW)
- Gross annual production
- 18 GWh (6 GWh)
- Ownership
- 34%
- Land lease remaining years
- Avg. 36
- Status
- Producing
Read more
Rusdalsåni hydropower is located in Lund, Rogaland.
Langedal Hydropower (Part of Forte portfolio)
- Location
- Norway (NO-3)
- Asset type
- Hydro
- In operation
- 2018
- Gross installed capacity
- 3.0 MW (1.0 MW)
- Gross annual production
- 12 GWh (4 GWh)
- Ownership
- 34%
- Land lease remaining years
- Avg. 47
- Status
- Producing
Read more
Langedal hydropower is located in Flora, Vestland.
Botna Hydropower (Part of Forte portfolio)
- Location
- Norway (NO-5)
- Asset type
- Hydro
- In operation
- 2020
- Gross installed capacity
- 2.0 MW (0.7 MW)
- Gross annual production
- 7 GWh (2 GWh)
- Ownership
- 34%
- Land lease remaining years
- Avg. 51
- Status
- Producing
Read more
Botna hydropower is located in Fjærland, Vestland.
Strupen Hydropower (Part of Forte portfolio)
- Location
- Norway (NO-3)
- Asset type
- Hydro
- In operation
- 2017
- Gross installed capacity
- 1.9 MW (0.3 MW)
- Gross annual production
- 7 GWh (2 GWh)
- Ownership
- 34%
- Land lease remaining years
- Avg. 47
- Status
- Producing
Read more
Strupen hydropower is located in Gloppen, Vestland.
Espeelvi Hydropower (Part of Forte portfolio)
- Location
- Norway (NO-5)
- Asset type
- Hydro
- In operation
- 2018
- Gross installed capacity
- 4.6 MW (1.6 MW)
- Gross annual production
- 12 GWh (4 GWh)
- Ownership
- 34%
- Land lease remaining years
- Avg. 51
- Status
- Producing
Read more
Espeeliv hydropower is located in Ullensvang, Vestland.
Bråberg Hydropower (Part of Forte portfolio)
- Location
- Norway (NO-5)
- Asset type
- Hydro
- In operation
- 2018
- Gross installed capacity
- 2.0 MW (0.7 MW)
- Gross annual production
- 6 GWh (2 GWh)
- Ownership
- 34%
- Land lease remaining years
- Avg. 51
- Status
- Producing
Read more
Bråberg hydropower is located in Ullensvang, Vestland.
Øvre Kvemma Hydropower
- Location
- Norway
- Asset type
- Hydro
- In operation
- H1 2024
- Gross installed capacity
- 8 MW
- Gross annual production
- 20 GWh
- Ownership
- 100%
- Land lease remaining years
- 38
- Status
- Under construction
Read more
Øvre Kvemma hydropower plant is located in Lærdal municipality in Vestland county. The expected annual production is 20 GWh (8 MW).
Munkhyttan vindpark
- Location
- Sverige (SE-3)
- Asset type
- Wind
- In operation
- Q4 2024
- Gross installed capacity
- 18 MW
- Gross annual production
- 60 GWh
- Ownership
- 100%
- Land lease remaining years
- 30
- Status
- Under construction
Read more
Munkhyttan wind farm is located in Lindesberg municipality, Sweden. Munkhyttan will have 3 wind turbines with an installed capacity of up to 18 MW and an expected annual normal production of up to 60 GWh. The power plant is under construction, and the wind farm is expected to be operational in the 4th quarter of 2024.
Duvhällen Wind Farm
- Location
- Sweden (SE-3)
- Asset type
- Wind
- In operation
- 2024
- Gross installed capacity
- 60 MW
- Gross annual production
- Approximately 165 GWh
- Ownership
- 100%
- Land lease remaining years
- 25
- Status
- Ready to construct
Read more
Duvhällen wind power plant is located in Eskilstuna municipality, Sweden, north-east of Lake Hjalmaren.
Nees Hede (Solar project)
- Location
- Danmark (DK-1)
- Asset type
- Solar
- In operation
- Expecting investment decision during 2024.
- Gross installed capacity
- Approximately 175 MW (ca 140 MW)
- Gross annual production
- Approximately 210 GWh (ca. 168 GWh)
- Ownership
- 89%
- Land lease remaining years
- 30 + 29 (option)
- Status
- Ready to construct